Tile "D"
"D" is finished. Final shot with structures. The acid building doesn't belong there. It lives at A6.
Tile "A"
"A" is finished. I have been struggling with the weather and weathering. Its too cold to spray. Everything takes forever to dry. D, A, B, C all got two coats of poly sealer. But before that went down the pigment fixer was not fixing shit. I ended up Spraying in doors again. None of the tiles fit in the spray booth and the fan don't suck hard enough to pull the flumes. All equal more dead brain cells.
Tile "E"
Tile E was the same story. I ended up spraying indoors.
The grass mat is down. I need to sort my track ballast.
Tile "B"
THE MOUNTAIN
Bought = 54Sold = 52, 5 detachments
Painted = 20328mm = 020mm = 015mm = 9610mm = 0Epic = 30Terrain bought = 0Terrain painted = 77
Printed Terrain = 0Minis Printed = 0
Games = 1Games hosted = 0
Painted = 203
28mm = 0
20mm = 0
15mm = 96
10mm = 0
Epic = 30
Terrain bought = 0
Terrain painted = 77
Printed Terrain = 0
Minis Printed = 0
Games = 1
Games hosted = 0
Books Bought = 0Read = 1
Books
Bought = 0
Read = 1
2023
2023
No comments:
Post a Comment