Counter sunk some screws
Center supports for the play topper
Both tables together
The 2nd tables play topper was warped. The topper will need a few more screws, I should be able to locket down. If not I will plane it.
The side rails are off height wise. I don't care. The real toppers won't be up against each other. The rails don't matter so much.
The front rails will get cut and mounted tomorrow. I may cover the play toppers with felt.
I scored a old beat up Craftsman work bench for 50 bucks. I am in for 230 total so far. If I had to make drawers they would have cost more. The rails for the drawers are not cheap either. I field stripped it for the drawers.
The drawers had rust spots. They were cleaned up with scotch bright.
The spots were primed. Then the whole drawer front sprayed Otter Brown.