The top, no the entire structure is not level. None of the independent buildings are square or level or anything else. So far my best efforts look as if a retarded kid stacked them. It is not my fault as these things were totally fucked to begin with.
The roofs were some what leveled by filling in the top with plaster. Then sanded and the edges cleaned up.The bottom was sanded as flat as possible or to establish enough territory to attach something solid. In an attempt to shore up or square the bottom trying to create a foundation. 2cm plastic card was glued to the bottom.
Onward to the base the building will sit on. Plastic card base built up will cork and detailed out with plastic card. It is all kind of what is laying around at the time.
The dudes are 15mm Carthaginians. Itched brass eagle, plastic eagles from the drop pod kit, and the steps and everything else is plastic card.
The roof is odd bits of plastic card.
There is about two more hours of pain to complete this piggy. Being a side project, it could be done be fall in.
No comments:
Post a Comment