The 3 main parts all done on the Ender 3. It took almost a roll? The ground floor was about 2 days, 1st floor a day and a half, and the 2nd floor about a day. The roof, doors and beams were done on the Flashforge.
The outside was rattle canned brick followed by desert yellow. Then short bursts of Matte Stone.
Craft paint brown blocking in the wood and mud brick areas.
The interior wooden floors are done. Brown craft paint followed by a AP speed paint watered down for a wash and a final dry brush of Model Color's New Wood.
The stairs are wooden. I did not notice right away. The same colors used, but the wash was not watered down.